Join Our Mailing List for FREE

Posted Leave a comment

Join over 3.000 visitors who are receiving our newsletter
and learn how we can help you in biomedical & biomechanical field.
We are your solution provider.

Join Our Newsletter , Subscribe for Free !

Full name

E-mail address

Disclaimer : We hate spam. Your email address will not be sold or shared with anyone else.


Vicon Training Workshop @ MJIIT

Posted Leave a comment

On 27th March 2018 , Aaron Chin , Senior Technical Support from Vicon Motion System Ltd UK come to Malaysia to give support for our basic Vicon training workshop held at MJIIT (Malaysia – Japan International Institute Technology). (more images click here MJIIT Vicon Training)

This workshop was organized after the relocation project already completed a few days before.

Relocation Vicon Lab @ MJIIT Part 03

Posted Leave a comment

On 24th March 2018 , we continue the relocation project at (MJIIT) Malaysia-Japan International Institute Technology .

Finally the camera , cabling and Vicon computer system ready to use. To make sure they’re all correct and funcioning well, we have to do some test with calibration wand. (click here for more visual MJIIT Part 03)

Relocation Vicon Lab @ MJIIT Part 02

Posted Leave a comment

On 23rd March 2018 , Summit Features Tech Crew went again to (MJIIT) Malaysia-Japan International
Institute Technology to continue the relocation project.

For the 2nd stage , still need to settle up the cable wiring & trunking connection. Plus we bring the metal bracket and iron rod to hold the Vicon Cam on top. (more images click here MJIIT Part 02)

 

 

Relocation Vicon Lab @ MJIIT Part 01

Posted Leave a comment

On 14th March 2018 , Summit Features Tech Crew went to (MJIIT) Malaysia-Japan International Institute Technology for a relocation vicon lab from old lab at level 6 to a new lab at other building , ground level.

(More Images click here MJIIT Lab Part 01)

For the 1st stage , we got to settle up cable wiring & trunking connection. This time the cable still connect on the middle wall with trunking cover, not on the top ceiling unlike PERKESO lab project.

This new lab got a wider spacious hall like a warehouse.

Relocation Project @ Rehab Center , PERKESO Melaka Part 04

Posted Leave a comment

On 27th March 2018 , we continued the Vicon Lab – Rehab Center , PERKESO Melaka project. This time , we manage to setup the metal force plate platform at the new lab. With professional neat and tidy look better than before this. Vicon Cam has been successful assemble at the metal bracket as well.

More pictures here Relocation Project @ Rehab Center , PERKESO Melaka Part 04